The “Beta X” initiative represents a major milestone in the industrial deployment of Magaldi’s Green Thermal Energy Storage technology (MGTES). Developed as the first industrial scale application of this fluidized sand bed storage system, the project aims to validate its technical performance, reliability, and suitability for decarbonizing heat intensive operations. Installed in Buccino (Salerno) and inaugurated in September 2025, the system continuously supplies 190 °C steam to an adjacent vegetable oil refinery, meeting around 15% of its thermal requirements and reducing emissions by more than 500 tons of CO₂ annually. Built using fully recyclable materials such as silica sand and steel, the installation demonstrates a scalable pathway toward clean and dispatchable industrial heat. Fichtner supported the project by providing independent technical advisory services throughout its execution.
Project Factsheet
Thermal storage capacity
Avoided CO₂ emissions per year
Steam temperature delivered
Key Facts
Client
Magaldi Group
Buccino (Salerno)
Italy
Enel Group
Rome
Italy
